Mantenimiento Parque Eólico Tres Hermanas – Marcona

Wind Farm Maintenance – Tres Hermanas Marcona

20/03/2022
Rate our content

Wind turbine maintenance and rotor disassembly was executed at the wind farm Tres Hermanas – Marcona. A 650 ton Terex SL3800 crane and a 200 ton American crane were used.

Client: Siemens

Leave a Reply

Your email address will not be published. Required fields are marked *

Copyright 2022 © Grúas y Maniobras

Developed By TiFACTOR