The Lima 2019 Pan American and Parapan American Games were held and VIDENA was the main venue during the competitions. The works included the construction of the Athletic Stadium, the Aquatic Center and the new sports center, which were completed in March 2019.
This mega sporting event marked a turning point in the country’s sporting future. “What was done in terms of the level of infrastructure is incredible. Very few countries in Latin America have seen this quality of construction and this level of infrastructure.” This was mentioned by the highest authority of Panam Sports and CEO of TV Record, Neven Illic. After the completion of the great event, the Peruvian capital is and will be the training center for athletes from all over the Americas.
Infrastructure Works for the Pan American Games
Our company is very proud to have been part of a project of great importance for the country. Cranes and Maneuvers contributed to VIDENA with the following infrastructure works:
1. Sports center
Together with the company FGA Ingenieros, the roof of the project was assembled, with the RT 180 crane, 80 tons capacity, RT 670, 70 tons capacity, and the Terex AC350 with 350 tons capacity.
2.Velodrome
In the same way, the roof of the velodrome was assembled with the new technology of Tridilosas Structures, together with the LANIK company, with the SL3800 crane, capacity of 650 tons.
Leave a Reply